• CLEAN AND ENVIRONMENTALLY FRIENDLY Natural gas is the cleanest and most environmentally friendly of all fossil fuels...Read more

  • WELL DRILLING PADThe size of a typical drilling pad is about 1 hectare. To compare, the floorage of an average shopping centre is 4.5 hectares... Read more

  • SECURING OF WELL DRILLING PADA drilling pad as well as the adjacent pool are reinforced and tightened with concrete slabs. Protective foil is additionally laid where necessary.

  • WORK NOISEWell drilling does not produce onerous noise. The intensity of sounds generated in connection with drilling work is lower than that generated by street traffic.Read more

  • SAFETY OF FRACTURING PROCESSIn Poland, exploration wells in shale rock are drilled to depths of over 2.5 km.Read more

  • COMPOSITION OF FRACTURING FLUIDFracturing fluid is 95% water. Read more

  • NO MAJOR LANDSCAPE INTERFERENCEIf gas production is launched, the land surrounding the isolated, secured zone, is subject to a reclamation treatment. Read more

Notes to the Consolidated Financial Statements – Contents

43. Events Subsequent to the Balance-Sheet Date

On February 21st 2013, Annex No. 2 (Annex) was executed to the Framework Agreement of July 4th 2012 concerning shale hydrocarbon exploration and production (Agreement). The Annex was signed by all parties to the Agreement, i.e. PGNiG SA, KGHM Polska Miedź S.A., PGE Polska Grupa Energetyczna S.A., TAURON Polska Energia S.A. and ENEA S.A. (“Parties”). The Parties agreed to extend the period in which they are to set the detailed terms of cooperation until May 4th 2013.

If the Parties fail to set the terms of cooperation by May 4th 2013, the Agreement can be terminated by any of the Parties. Moreover, if the Parties fail to secure all the required corporate approvals within three months of the date when the detailed arrangements are made or if relevant concentration clearances are not obtained by December 31st 2013, the Agreement will expire.